Role: Script Collaboration / Director / Camera Operator / Editor
Project description: 5 films for the project "Blue-Green Infrastructure in the Municipality of Leśna"
Responsibilities:
- Production preparation, script collaboration, documentation, location scouting.
- Directing.
- Drone cinematography.
- Editing of 5 films.
- Animations based on supplied graphics.
- Voice-over scripts for the reportage.
- Audio description for all films.
Challenges:
- Documenting a project running behind schedule.
- Changing weather conditions.
- 550 km to the filming locations.
- Difficult audio environment (active construction site).
Results:
- 1 reportage on the project's impact on the residents of the Leśna municipality.
- 1 film explaining the idea behind the phrase "healthy river."
- 3 educational films on retaining rainwater in the garden.
Key takeaways:
- The ElevenLabs AI software worked remarkably well for cleaning up audio recorded largely on an active construction site.
- Media management (cataloguing, backups) is critical on a project running for 10 months.
Reportaż Od suszy do powodzi - działania w gminie Leśna
Przywrócić zdrowie rzece. Działania na rzecz ograniczania suszy i powodzi.
Jak pielęgnować ogród by zatrzymać w nim jak najwięcej wody deszczowej.
Jak dobrać rozwiązanie retencyjne do terenu.
Poradnik małej retencji. Jak stworzyć ogród deszczowy krok po kroku.